The Process of Installing an an Automatic Sliding


A door opener is a complex set of steps and procedures. Each procedure must be done with care. In this article, we will discuss the setup for the automated sliding door opener

Installation of Aluminum Alloy Casing

 

When you are installing the aluminum alloy casing, be sure to ensure that it is straight and horizontal. The error is one millimeter. If the door is not level, it could result in the fact that it is stronger than the door isn't equal in operation. This can lead to a decrease in machine service duration.

The Installation of Door Hanger

 

The hanger pieces should be positioned at the appropriate place on the door with the door hanger bolt. Check that the pulley is centers on the device for hanging is positioned and the door are in parallel. in the event that they are not parallel, it could reduce the lifespan of the pulley. The pulley is hung from the hanging device over the beam of power. Be careful not to scratch other components and guide rails of the beam's power the installation. In the event of damage, it could result in component failure or pulley performance, noise or or abnormal sound , etc.

 

 

Stop Device Assembly: Unlock the Bolts for Mounting the Stopper.

 

This device has been considered to be a part of the beam of power. The first step is to move the door to establish the door's closing and opening positions then identify the position that the device is located. If you are able to set the location that the limitation device is you should ensure that the hanging device touch the stop pad immediately after the stop. The mounting bolts must be tightened using a the hex wrench.

 

 

Door Gap and Height Adjustment:

 

Release the nuts on the hanger fixed. Adjust the adjustment bolts in a safe manner.
The nuts should be tightened for the brackets that mount. Check the resistance while walking. Verify that the door's movement does not cause a delay, and that there isn't any sound of friction If you have any problems Please verify the following:

* The hanging is fixed vertically to the door.

* If the device that is hanging is in contact with the beam power
* If it is the case that there's friction between your door and door frame's door moving leaf and the ground height is typically maintained at 10mm. The distance between the moving leaf and the fixed leaf is 5 millimeters.

 

Automatic Sliding Door Belt Tension Adjustment:

 

Move the tensioner assembly to the left, tightening the belt, then tighten the four bolts. Unlock the four adjusting bolts and rotate the tension adjusting bolt counterclockwise in order to alter the tension of your belt. Secure the four fixing plates for adjusting bolts.

 

 

Installation of the Electronic Sliding Door Sensor

 

 

Remove the sensor Prior to installation, you should remove the cover on the back of the sensor using a screwdriver. Installation preparation for the sensor: Set the drawing of the sensor in the location of installation as per the holes in the map, and then let the sensor wire will be removed from the hole in the pin. Connection and installation of the wire is routed through the hole for lead-through and tightened with the screws and hold the wire long enough to connect directly to the block of terminals. Alter the angle of the sensor's radiation in accordance with the environment at the site to choose the right angle. Adjust take care not to get the plane antenna in contact with it. In order to avoid making it malfunction.

 

After installation, take precautions to install an Automatic sliding door opener

 

 

Adjustment to the Control System: (under normal circumstances do not need to adjust, just maintain the factory settings) prior to you adjusting the doors, by shifting the door a few times so that the door will be a smooth switching. Adjust the toggle left or right switches according to the door's opening direction, and set it to the right or left. When the door is open double the switch will be turned to the left. The power switch should be turned on when the door is shut. Set the control box to the desired position on the knob: the idea is to hit the control box of the test button while the door is closing and opening while you changing the different projects.

The intensity should be adjusted to the beginning The intensity must make sure that the door is shut and open are completely free.
Adjust the speed of opening and the Opening buffer size:
Make sure that the door's opening speed and buffer distance are in the middle range (factory adjustment).
Adjust the buffer for opening the door length to 10-20 centimeters.
Adjust the speed of opening of the door The first step is to confirm the door's opening speed, then adjust the distance of the buffer for the door.

We can be reached at:

Limiter devices are found to be a part of that rail on the power beam. The first step is to move the door in order to determine the door's opening and closing location and then identify the position that the device is located. Once you have determined the location for the device to limit must make the device strike the stop pad following the stop. Make sure that the mounting bolts are tightened using a hex wrench.

*Precautions:
If you're using the electromagnetic lock, make sure to press your test key after the lock has been unlocked.
It is important to ensure there aren't any pedestrians in the vicinity of the door following adjustment to prevent personal injury.
Don't adjust the knob too much degree, as it could result in damages to the door.

Adjust the buffer's speed: adjust it to ensure that the door doesn't be visible when the switch is made the bigger impact.

Adjust the duration of the opening and hold time Based on the requirements of the customer Adjust to approximately 1 second with no instruction.

 

Move the tensioner assembly to left, tighten the belt and tighten the four bolts. Release the four bolts that adjust the tension and rotate the tension adjusting bolt counterclockwise in order to alter the tension of your belt. Secure the four fixing plates for adjusting bolts.

Once the installation is complete close the door and examines the door's moving leaf active area free of obstructions, and the sensor area is free of any active persons. Then, switch off the power. The first time you turn the power on the door, it will gradually move to record the door's direction.

 

These are sliding doors that are automated. opener installation techniques and one place to be considered. Automated sliding doors are suitable for banks, hotels, hotels offices, hospitals, office buildings shops, etc. It is extensively used if you want to install an automatic door in Perth feel free to contact us COM-Al Window.